ABOUT
Why Choose Clescrane?

1. As for same equipment, lower plant investment 20%~30%, comprehensive energy consumption reduced by 22%~32.8, decreasing maintenance personnel 2 to 8, the lifetime of parts and auxiliary equipment longer 3-5 years compared with other competitors.
2. The design of CH and CCH Series is from Germany, modular design reducing the species and qty. of spare parts, parts and auxiliary equipment are from Europe,safer and greatly reduce downtime.
3. The material and welding line through strict detection, periodic maintenance can enlarge more 20 years’ lifetime for equipment.
4. Prefessional site guidance teamand localized service provider settle your worries.
Our calculating all for you, to promote business competitiveness, reduce your long term investigate cost (our real case).
200/50t+200/50t x 40m Comparison Table
Requirements on building structure | |||
200/50t+200/50t Crane | QD | CWD | Advantages comparison |
Height above the rail(mm) | 4950 | 4153 | Reduce height 16% |
Hook left /right limit(mm) | 3000 | 1575 | Increasing running space 3.5% |
Min. spacing between main and aux. hooks | 2240 | 1960 | Reducing spacing 15% |
Requirements on building foundation structure | |||
Dead weight (t) | 334.5 | 251.5 | Lower 26% |
Max. load pressure (KN) | 480 | 385 | Lower 20% |
Requirements on power feed | |||
Total power (Kw) | 286.4 | 254 | Lower 12% |
Differences on operation management | |||
Failure rate | 3% | 0.5% | Lower 83% |
Maintenance period /per time | 3 days | 5 hours |
Maintenance period reduce 80% |
Maintenance personnel /set/per time | 4~6 people | 2 people | Decrease60% |
Differences on Configuration | |||
Motor | Kiamusze | ABB(import) | Import VFD motor |
Reduction gear | Taixing, Tailong, Dongtai | SEW(import) | Import hard-tooth surface reduction gear |
Brake | Jiaozuo Changjiang |
Disk type or Jiaozuo Jingu, One million times |
Braking steady and reliable, self-compensating |
Bearing |
High imitation, Haerbing bearing and Luoyang bearing |
NSK,SKF,FAG | Import bearing |
Wire rope | Guizhou wire rope | UK Bridon,Verotop | Import wire rope |
Drive form of crane and hoist | Transmission shaft | SEW three in one |
Without outertransmission, Three in one |
Requirements on building structure | |||
350/100t Crane | QD | CWD | Advantages comparison |
Height above the rail(mm) | 5300 | 4573 | Reduce height 14% |
Hook left /right limit (mm) | 4120 | 3522 | Increasing running space 2% |
Min. spacing between main and aux. hooks (mm) | 3940 | 3300 | Reducing spacing 16% |
Requirements on building foundation structure | |||
Dead weight(t) | 339 | 232 | Lower 31.5% |
Max. load pressure(KN) | 450 | 380 | Lower 16% |
Requirements on power feed | |||
Total power (Kw) | 280 | 182 | Lower 35% |
Differences on operation management | |||
Failure rate | 3% | 0.5% | Lower 83% |
Maintenance period /per time | 3 days | 5 hours | Maintenance period reduce 80% |
Maintenance personnel /set/per time | 4~6 people | 2 people | Decrease 60% |
Differences on Configuration | |||
Motor | Kiamusze | ABB(import) | Import VFD motor |
Reduction gear | Taixing, Tailong, Dongtai | SEW(import) | Import hard-tooth surface reduction gear |
Brake | Jiaozuo Changjiang |
Disk type or Jiaozuo Jingu, One million times |
Braking steady and reliable, self-compensating |
Bearing | High imitation, Haerbing bearing and Luoyang bearing | NSK,SKF,FAG | Import bearing |
Wire rope | Guizhou wire rope | UK Bridon, Verotop | Import wire rope |
Drive form of crane and hoist | Transmission shaft | SEW three in one | Without outer transmission, |
Requirements on building structure | |||
50t Crane | QD | CWD | Advantages comparison |
Height above the rail(mm) | 3050 | 1592 | Reduce height 16% |
Hook left /right limit(mm) | 1650 | 1036 | Increasing running space 2.1% |
Min. spacing between main and aux. hooks(mm) | |||
Requirements on building foundation structure | |||
Dead weight(t) | 66.284 | 34.95 | Lower 47.2% |
Max. load pressure(KN) | 470 | 180 | Lower 61.7% |
Requirements on power feed | |||
Total powerkW | 99 | 29.6 | Lower 70% |
Differences on operation management | |||
Failure rate | 3% | 0.5% | Lower 83% |
Maintenance period /per time | 3 days | 5 hours | Maintenance period reduce 80% |
Maintenance personnel /set/per time | 4~6 people | 2 people | Decrease 60% |
Difference on Configuration | |||
Motor | Kiamusze | Import Motor | Import double speed motor |
Reduction gear | Taixing, Tailong, Dongtai | SEW(import) | Import hard-tooth surface reduction gear |
Brake | Jiangxi Huawu, Jiaozuo Jingu |
Disc type, One million times |
Braking steady and reliable, self-compensating |
Bearing | High imitation, Haerbing bearing and Luoyang bearing | NSK,SKF,FAG | Import bearing |
Wire rope | Guizhou wire rope | UK Bridon, Verotop | Import wire rope |
Drive form of crane and hoist | Transmission shaft | SEW three in one | Without outer transmission, |
Requirements on building structure | |||
30+30t Crane | QD | CWD | Advantages comparison |
Height above the rail(mm) | 2550 | 2144 | Reduce height 16% |
Hook left /right limit(mm) | 2000 | 1120 | Increasing running space 2.3% |
Min. spacing between main and aux. hooks(mm) | 3000 | 1900 | Reducing spacing 36% |
Requirements on building foundation structure | |||
Dead weight(t) | 88.35 | 54.1 | Lower 38.8% |
Max. load pressure(KN) | 340 | 235 | Lower 30.8% |
Requirements on power feed | |||
Total powerkW | 70 | 60 | Lower 14.3% |
Differences on operation management | |||
Failure rate | 3% | 0.5% | Lower 83% |
Maintenance period /per time | 3 days | 5 hours | Maintenance period reduce 80% |
Maintenance personnel /set/per time | 4~6 people | 2 people | Decrease 60% |
Differences on Configuration | |||
Motor | Kiamusze | Import Motor |
Import double speed motor |
Reduction gear | Taixing, Tailong, Dongtai | SEW(import) | Import hard-tooth surface reduction gear |
Brake | Jiangxi Huawu, Jiaozuo Jingu |
Disc type, One million times |
Braking steady and reliable, self-compensating |
Bearing | High imitation, Haerbing bearing and Luoyang bearing | NSK,SKF,FAG | Import bearing |
Wire rope | Guizhou wire rope | UK Bridon, Verotop | Import wire rope |
Drive form of crane and hoist | Transmission shaft | SEW THREE IN ONE | Without outer transmission, |
Comparison items | Comparison | Advantages |
Impact on building foundation construction | In the case of the same lifting height,the height above the rail reduce by 15% |
For example, as for same plant 30m*300m planning and design,through lower plant height, reduce size of support rail beam and columns, decreasing the influence of pile foundation on the overall plant cost reach 15 ~ 20%. Calculated based on current plant 60,000 square meter, saving total cost 2.7 million~3.7million $ Lifting scope increasing 30m x 2.47% x 300m= 222.3 ㎡ |
As for same lifting capacity, the plant carrying load lower 32% | ||
As for same equipment, the lifting scope increasing 2.47% | ||
Impact on energy consumption | As for same equipment, the energy consumption decreasing by 32.8% |
In China, e.g. 2 set of 200/50+200/50t, 260 working days yearly, average working time 10 hours per day, full load working 3 hours per day, saving energy consumption cost 194.4KW every day, 50544 kW per year. Save electricity 50544kW*0.6=4,493$ If the lifetime for this equipment is 20 years, total electricity saving cost is 4493$*20=89,860$ |
Impact on management | As for same equipment, reduce maintenance personnel 5~8 | According to Chinese enterprise average wage 7,110$ yearly, saving labor cost 7,110*5=35,550$ |
As for same equipment, annual failure rate reduced by 83%, annually maintenance time reduced by 80% | Calculated by 260 working days/ per year, the equipment failure rate reduced by 6.5 days, if maintain 4 times yearly, only need 2 days/ set yearly. | |
Impact on the use |
The maintenance period for import reduction gearbox long to 3~5 years, lifetime is 20 years. The maintenance period for domestic reduction gearbox long to 2~3 years, lifetime is 5~8 years. |
The overall exchange cost for 34 equipment is 0.89 million $ ~1.19million $ The production delay is 120 days. |
The maintenance period for domestic brake is 7~14 days. The change circle of internal contracting brake is 3~6 months The maintenance period for Chinese top brands or import disk brake is 2~3 years, the lifetime is 3~5 years. |
QD products change parts very frequent, causing the equipment often in maintenance stage and a large number of spare parts reserves at the same time. | |
The lifetime for domestic bearing is 2~3 years, the import bearing is 5~10 years | ||
The lifetime for domestic wire rope is 0.5~2 years, the import wire rope is 5~8 years | ||
Impact on mantenance | QD Series products, spare sparts influenced by various suppliers, the maintenance can’t be effectively guaranteed, the spare parts of CWD type directly supplied by CLESCRANE and reliable. |
CWD type products adopt modular design, reducing the species of spare parts, set up spare parts store based on clients’need. The service and management of spare parts get effective simplification and promotion. |
-
MH Series Single Girder Gantry Crane
Lifting Capacity: 3~16t
Span: 12m~30m
Lifting Height: 6m,9m,12m,18m, 24m, 30m
Working Class: A3,A4
Remarks: L type gantry crane can be customized
-
MG Series Double Girder Gantry Crane
Lifting Capacity: 5~500t
Span: 18m~35m
Lifting Height: Customized
Working Class: A3, A4, A5, A6
-
LH Series Double Girder Overhead Crane
Lifting Capacity: 1~100t
Span: 7.5m~31.5m
Lifting Height: 6m,9m,12m
Working Class: A3,A4
-
QD Series Overhead Crane with Hook
Lifting Capacity: 5~320t
Span: 10.5m~31.5m
Lifting Height: 12m,14m,16m,18m,20m,22m,24m,26m
Working Class: A5, A6